Book a Stand Register to Visit Plan Your Trip
Nigeria

The Nigerian steel market

Demand and supply have never been closer to balanced — and that is the whole commercial argument for this show.

~10 Mt

Annual demand

Yearly steel requirement across construction, manufacturing and infrastructure.

NSRMEA · 2022 verify year
2.2 Mt

Actual output

Against 11.14 Mt/y installed capacity — utilisation of roughly 19.7%.

NSRMEA · 2022 verify year
< 20%

Self-sufficiency

Domestic coverage of demand; import dependency above 2 Mt per year.

Mysteel · Oct 2026 verify
$4 bn

Import bill

Annual foreign exchange spent on steel imports.

MSD Minister · 2024–26 verify

Demand vs. supply

The gap, visualised

Annual demand~10 Mt
Actual output2.2 Mt
Installed capacity11.14 Mt/y
Capacity utilisation~19.7%

Installed capacity exceeds demand — the constraint is operation, not equipment. Source years to confirm

Plant status

Total steel plants74
Operating40
Idle or under-utilised34

Each idle plant is a re-commissioning project: refractories, electrodes, spares, automation, and the service contracts that follow.

Plant counts per the show's market analysis verify

Policy & tariff position

Tariff and policy measures relevant to equipment buyers
MeasurePositionEffect on buyersStatus
Metallurgical equipment import dutyZeroLanded cost of plant and machinery reducedVerify
Agricultural & manufacturing machinery0% under 2026 FPM revisionWider machinery categories benefitVerify
Tax holiday for qualifying investment3–5 yearsImproves project payback for plant investmentVerify
AfCFTA tariff reductionPhased implementationCheaper intra-African movement of steel productsVerify
Local content requirementsSector-specificFavours in-country partnerships and after-sales coverTo detail
Tariff positions are carried from the show's market chapter and must be re-verified against the current official schedule before publication. A wrong tariff claim on a page read by finance teams is a serious credibility loss.

Domestic producers

Nigerian steel sector — principal operators
Company / siteTypeStatusRelevance to exhibitors
Ajaokuta Steel CompanyIntegratedRevival contracting 2027 VerifyFull value-chain re-commissioning
Delta Steel CompanyIntegratedRestart — US$1.3 bn, PSML VerifyLong-lead equipment, refractories
Private rolling millsRolling / processingOperatingRolling, finishing, automation, tooling
Induction-furnace mini millsEAF / inductionOperatingFurnaces, electrodes, scrap handling
Foundries & castersCastingOperatingMoulding, patterns, sand systems
Named-company rows are structural. Supply the brochure's Chapter 3 producer table with capacities and statuses and it drops into this table without layout change.

Secure your position at
West Africa's first steel trade show

Stand allocation is first come, first served. Early-bird rates apply until 15 March 2027. All scale figures are planning targets for Africa's only platform, not historical performance.

Book a Stand Register